The 7.15MW grid-following centralized PCS integrated energy storage unit is a core power conversion and control device designed exclusively for utility-scale energy storage power stations. Adopting a highly integrated design philosophy, it seamlessly integrates energy storage converters, power transformers and electrical protection units into a single cabin. This all-in-one solution can be directly connected to medium and high voltage power grids, enabling efficient bidirectional energy conversion between battery packs and the grid with strict grid-following characteristics that precisely match grid parameters. It is the ideal choice for project developers and operators seeking reliable, cost-effective and space-saving energy storage solutions.
Our integrated PCS transformer unit features a triple three-dimensional layout within a single cabin, reducing equipment volume by 60% and saving 30% of construction land compared to traditional split systems. This is particularly valuable for projects in areas with scarce land resources, significantly lowering land acquisition and site preparation costs.
Housed in a robust containerized structure with IP54 protection rating, the unit delivers exceptional resistance to earthquakes (up to magnitude 8) and salt spray corrosion. It ensures stable 24/7 operation even in extreme weather conditions, minimizing downtime and maintenance expenses for long-term project profitability.
All internal connections and comprehensive pre-commissioning are completed at the factory before delivery. This eliminates complex on-site assembly work, shortening the overall construction period by 40%. Project owners can bring their energy storage systems online much faster, accelerating revenue generation and return on investment.
Equipped with an advanced intelligent control system, the unit supports real-time remote monitoring, automatic fault diagnosis and partial power-off maintenance. This significantly improves operational efficiency, reduces on-site labor requirements and ensures optimal system performance throughout its service life.
Parameter | Specification |
Rated Power | 7.15MW |
Grid Connection Voltage | 35kV |
Maximum Conversion Efficiency | ≥98.5% |
Protection Rating | IP54 |
Seismic Resistance | 8 magnitude |
Operating Temperature Range | -30℃ to +55℃ |
Altitude Limit | ≤2000m |
Communication Protocols | Modbus TCP/IP, IEC 61850 |
Cooling System | Forced Air Cooling |
Photovoltaic power station Photovoltaic power station energy storage matching: Solve curtailment issues and maximize solar energy utilization
Grid peak shaving and valley filling: Reduce electricity costs and improve grid stability
Industrial park integrated energy services: Optimize energy consumption and lower operational expenses
Off-grid microgrids in remote areas: Provide reliable power supply where grid access is unavailable
The unit operates reliably in a wide range of environmental conditions, including high humidity, dusty areas and coastal regions with high salt content. We offer comprehensive customization solutions to meet specific project requirements, including:
High-altitude adaptation for projects above 2000m
Enhanced anti-corrosion treatment for coastal and marine environments
Customized grid connection solutions to comply with local utility standards
Tailored control system configurations for different application scenarios
Huachen is a trusted provider of advanced energy storage solutions for large-scale projects worldwide. We combine cutting-edge technology with rigorous manufacturing standards to deliver products that exceed industry performance and reliability requirements. Our dedicated engineering team provides full-cycle support from project design to after-sales service, ensuring your energy storage project is completed on time and within budget.
The integrated design eliminates the need for separate cabins for PCS and transformers, reducing land use by 30% and construction time by 40%. It also simplifies on-site installation and reduces potential connection points that could cause failures.
With factory pre-commissioning, a single unit can be installed and commissioned on-site in just 7-10 days, compared to 3-4 weeks for traditional split systems.
Yes, our system is compatible with all major battery chemistries including lithium iron phosphate (LFP) batteries, making it highly flexible for different project requirements.
Ready to optimize your energy storage project with our 7.15MW centralized PCS integrated energy storage converter and booster all-in-one machine? Contact our project engineering team today to receive a detailed, customized quote tailored to your specific site conditions and operational needs. We will work closely with you to design the most cost-effective and high-performance solution for your utility-scale energy storage project.
Home About HuaChen Products Solutions Support News Contact Us