New energy Transformer Substation is a high-voltage/low-voltage pre-installed substation which integrates high-voltage switchgear, transformer body and protective fuse in the oil tank, and integrates low-voltage switchgear and corresponding auxiliary equipment. It is a kind of boost equipment which can output electric energy upward through the 10kV or 35kV line after the voltage of the new energy grid-connected inverter (or alternator) rises to 10kV or 35kV through the boost transformer. It is the ideal supporting equipment of the new energy power generation system.
1.Compact structure,small area, external radiator , better cooling effect.
2.It is with new transformer series technology, reasonable structure, stable and reliable.
3. Transformer oil is used as the insulating medium of 10KV or 35KV side HV elements, greatly reducing the reliable distance.
4.The tank adopts the fully sealed structure, so that the oil and atmosphere are isolated, so that can reduce the oxidation process and water vapor intervention,improve the stability, reliability and stability of the system equipment. Meanwhile, it uses chip radiator with easy disassembly and assembly, simple maintenance.
5.The substaion shell is treated with special spraying process, which has good anti-corrosion and anti-exposure ability and can effectively resist the erosion of wind sand.
6.The low voltage side adopts the new intelligent circuit breaker, plastic-case air switch, which has high sectional capacity and good protection performance.
7.The transformer oil tank can be equipped with a pressure gauge and thermometer with a communication interface, and the load switch can be equipped with a travel switch to
realize the remote monitoring, operation and maintenance of the transformer.
8. The substation shell adopts the fully sealed design, the protection grade of the high and
9. low pressure chamber can reach IP54, and the transformer body can reach IP68.