Jiangsu Huachen Transformer Co.,Ltd.
You are here: Home » Products Center » Integrated Energy Storage Cabinet » Liquid-Cooled Energy Storage Integrated Cabinet 100kW 215kWh

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Liquid-Cooled Energy Storage Integrated Cabinet 100kW 215kWh

The 100kW/215kWh liquid-cooled energy storage cabinet adopts an integrated design concept. It is a highly integrated energy storage product that combines battery system, BMS, PCS, EMS, fire protection and other systems. Featuring flexible deployment, it is equipped with functions including peak shaving and valley filling, demand management, dynamic capacity expansion and power demand response, meeting diverse energy storage application requirements.
Availability:
Product Description

Product Overview

Developed by Jiangsu Huachen, the ESS2-100-215 liquid-cooled energy storage integrated cabinet is a highly integrated, all-in-one energy storage solution built for industrial and commercial energy management needs. This 100kW/215kWh system adopts an advanced integrated design concept, which fully integrates the battery system, BMS (Battery Management System), PCS (Power Conversion System), EMS (Energy Management System), and dedicated fire safety system into a single cabinet. With flexible deployment capability and complete grid support functions, this 100kW 215kWh integrated energy storage system delivers reliable performance for peak shaving and valley filling, demand management, dynamic capacity expansion, and power demand response, fully adapting to diverse energy storage application requirements for enterprise clients.

Liquid-Cooled Energy Storage Integrated Cabinet 100kW 215kWh

Core Project Challenges & Targeted Solutions

Excessive Land Occupation & High On-Site Installation Costs

Traditional split-type energy storage systems require separate equipment layout, complex on-site wiring, and long construction cycles, leading to high land rental and labor costs for industrial and commercial projects. Our ESS2-100-215 energy storage integrated cabinet adopts a pre-integrated, factory-tested all-in-one design, eliminating the need for on-site assembly of core components. This reduces on-site construction time by over 80%, cuts land occupation by 60% compared to split systems, and significantly lowers upfront investment and installation costs for project operators.

Grid Compatibility Risks & Unstable Energy Management

Industrial and commercial facilities often face voltage fluctuations, peak demand penalties, and unstable grid connection performance with mismatched energy storage components. The system’s fully integrated EMS and PCS work in tandem with high-precision BMS, realizing real-time grid status monitoring, automatic load matching, and seamless grid connection. It effectively mitigates grid fluctuation risks, avoids peak demand charges, and ensures stable, compliant operation of the facility’s power system.

Complex O&M & Hidden Safety Hazards

Decentralized energy storage systems require separate maintenance for each component, with low visibility of system status and high safety risks from uncoordinated protection mechanisms. The integrated design of the ESS2-100-215 liquid-cooled energy storage cabinet enables unified monitoring and one-click O&M of all core systems, with a multi-level built-in fire safety system that provides full-process protection from battery cell to cabinet level, minimizing safety hazards and reducing daily operation and maintenance workload by over 70%.

Technical Specifications

Model Information

Model

HCESS1-100-215

AC & DC Side Parameters

AC Side Parameters

Value

DC Side Parameters

Value

Grid Voltage

400Vac

Battery Type

LFP 280Ah

Connection Method

Three-phase Four-wire

Rated Battery Capacity (@BOL)

215kWh @25°C/100kW

Rated AC Power

100kW

Rated DC Voltage

768V

Rated AC Current

150A

DC Voltage Range

600~876V

Rated Grid Frequency

50/60Hz

Rated Charge-Discharge Rate

0.5C

Adjustable Power Factor Range

1 (leading) ~ 1 (lagging)

Maximum DC Current

160A

THDi (at Rated Power)

<3%

-

-

System Parameters

System Parameters

Value

Isolation Mode

Non-isolated

Maximum Charge-Discharge Efficiency

≥87%

Dimensions (W×H×D)

1350×2300×1300mm

Depth of Discharge (DOD)

≤90%DOD

Weight

Approx. 2500kg

Battery Temperature Control Mode

Liquid Cooling & Liquid Heating

Operating Temperature

-15°C ~ 45°C

Noise Level

≤75dB

System Service Life

6000 cycles @25°C, 0.5CP

IP Protection Rating

IP54

Altitude

Below 2000m (Derating required if exceeded)

Fire Protection System

Perfluorohexanone Fire Suppression + Gas/Smoke/Temperature Detection

Key Advantages of ESS2-100-215 Energy Storage Integrated Cabinet

Ultra-high Integration & Rapid Deployment: Factory pre-integration and full testing ensure plug-and-play operation, with extremely short on-site deployment time to meet fast project launch needs.

High-Efficiency Liquid Cooling Thermal Management: Advanced liquid cooling system maintains uniform battery temperature within ±2℃, extending battery cycle life by over 30% and improving system charge-discharge efficiency.

Smart Full-Link Energy Management: The integrated EMS realizes intelligent load scheduling, real-time energy data analysis, and automatic response to grid signals, maximizing energy cost savings for industrial and commercial operators.

All-Round Safety Protection: Multi-level safety design from cell to system, with dedicated fire suppression system, ensures stable and safe operation in harsh industrial and commercial environments.

Target Application Scenarios

The ESS2-100-215 commercial and industrial energy storage cabinet is ideal for a wide range of scenarios, including industrial parks, small and medium-sized manufacturing facilities, commercial complexes, small and medium data centers, retail chains, and distributed renewable energy matching projects. It is perfectly suited for enterprise clients with standardized energy management needs and clear peak-valley arbitrage requirements.

Quality Assurance & Industry Qualifications

Our ESS2-100-215 integrated energy storage system is manufactured in strict accordance with international industry standards, including IEC 62619, UL 1973, and CE certification requirements. Each cabinet undergoes rigorous factory testing, including charge-discharge cycle testing, high and low temperature performance testing, and safety protection testing, to ensure long-term stable operation. We provide full life cycle quality management and technical support, delivering reliable, compliant energy storage solutions for global industrial and commercial clients.

Get Your Customized Solution Today

Whether you need a standardized 100kW 215kWh energy storage integrated cabinet or a tailored energy management solution for your facility, our professional engineering team is ready to support you.

Previous: 
Next: 
Inquiry

About Company

ALL THE EFFORTS OF HUACHEN PEOPLE,
ALL FOR CUSTOMER SATISFACTION.
 

Quick Links

Product Category

Contact Us

 Tongshan Economic Development Zone Industrial Park , No. 2 Qianjiang Road, Xuzhou, Jiangsu Province,China
      sales@hcbyq.com
  +86-15152458816
 Wechat : +86-15152458816
 Whatsapp:+8613624197312
      
Copyright © 2022 Jiangsu Huachen Transformer Co.,Ltd. All rights reserved. 苏ICP备07503629号-8   Support by leadong | Sitemap
We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×