Centralized Energy Storage Converter and Boost Integrated Machine

The 7.15MW energy storage integrated unit (centralized PCS) and the grid-type are the core power conversion and control equipment designed for large-scale energy storage power stations. Adopting a highly integrated design concept, they integrate key modules such as energy storage converters, transformers, and electrical protection units into one unit.It can directly connect to the medium and high-voltage power grid, achieving efficient bidirectional energy conversion between the energy storage battery group and the power grid, and possessing the grid-following characteristic of strictly adhering to the parameters of the power grid.
Availability:
Description


Product Overview


The 7.15MW grid-following centralized PCS integrated energy storage unit is a core power conversion and control device designed exclusively for utility-scale energy storage power stations. Adopting a highly integrated design philosophy, it seamlessly integrates energy storage converters, power transformers and electrical protection units into a single cabin. This all-in-one solution can be directly connected to medium and high voltage power grids, enabling efficient bidirectional energy conversion between battery packs and the grid with strict grid-following characteristics that precisely match grid parameters. It is the ideal choice for project developers and operators seeking reliable, cost-effective and space-saving energy storage solutions.


Energy Storage Converter Inverter Booster Machine - Centralized Type


Key Features & Project-Centric Benefits


Highly Integrated Design for Cost and Space Reduction

Our integrated PCS transformer unit features a triple three-dimensional layout within a single cabin, reducing equipment volume by 60% and saving 30% of construction land compared to traditional split systems. This is particularly valuable for projects in areas with scarce land resources, significantly lowering land acquisition and site preparation costs.


Intelligent and Reliable Performance in Harsh Environments

Housed in a robust containerized structure with IP54 protection rating, the unit delivers exceptional resistance to earthquakes (up to magnitude 8) and salt spray corrosion. It ensures stable 24/7 operation even in extreme weather conditions, minimizing downtime and maintenance expenses for long-term project profitability.


Ultra-Fast Deployment to Accelerate Project ROI

All internal connections and comprehensive pre-commissioning are completed at the factory before delivery. This eliminates complex on-site assembly work, shortening the overall construction period by 40%. Project owners can bring their energy storage systems online much faster, accelerating revenue generation and return on investment.


Smart Control System for Flexible Scheduling and Efficient O&M

Equipped with an advanced intelligent control system, the unit supports real-time remote monitoring, automatic fault diagnosis and partial power-off maintenance. This significantly improves operational efficiency, reduces on-site labor requirements and ensures optimal system performance throughout its service life.


Technical Specifications


Parameter

Specification

Rated Power

7.15MW

Grid Connection Voltage

35kV

Maximum Conversion Efficiency

≥98.5%

Protection Rating

IP54

Seismic Resistance

8 magnitude

Operating Temperature Range

-30℃ to +55℃

Altitude Limit

≤2000m

Communication Protocols

Modbus TCP/IP, IEC 61850

Cooling System

Forced Air Cooling


Ideal Applications & Use Cases


Photovoltaic power station Photovoltaic power station energy storage matching: Solve curtailment issues and maximize solar energy utilization

Grid peak shaving and valley filling: Reduce electricity costs and improve grid stability

Industrial park integrated energy services: Optimize energy consumption and lower operational expenses

Off-grid microgrids in remote areas: Provide reliable power supply where grid access is unavailable


Centralized Energy Storage Converter and Boost Integrated Machine


Operating Conditions & Customization Solutions


The unit operates reliably in a wide range of environmental conditions, including high humidity, dusty areas and coastal regions with high salt content. We offer comprehensive customization solutions to meet specific project requirements, including:

  • High-altitude adaptation for projects above 2000m

  • Enhanced anti-corrosion treatment for coastal and marine environments

  • Customized grid connection solutions to comply with local utility standards

  • Tailored control system configurations for different application scenarios


Why Partner With Huachen


Huachen is a trusted provider of advanced energy storage solutions for large-scale projects worldwide. We combine cutting-edge technology with rigorous manufacturing standards to deliver products that exceed industry performance and reliability requirements. Our dedicated engineering team provides full-cycle support from project design to after-sales service, ensuring your energy storage project is completed on time and within budget.


FAQ


What is the main advantage of the integrated design compared to traditional split systems?

The integrated design eliminates the need for separate cabins for PCS and transformers, reducing land use by 30% and construction time by 40%. It also simplifies on-site installation and reduces potential connection points that could cause failures.


How long does it take to deploy a single 7.15MW unit?

With factory pre-commissioning, a single unit can be installed and commissioned on-site in just 7-10 days, compared to 3-4 weeks for traditional split systems.


Can the unit be integrated with different battery technologies?

Yes, our system is compatible with all major battery chemistries including lithium iron phosphate (LFP) batteries, making it highly flexible for different project requirements.


Get Your Custom Project Quote


Ready to optimize your energy storage project with our 7.15MW centralized PCS integrated energy storage converter and booster all-in-one machine? Contact our project engineering team today to receive a detailed, customized quote tailored to your specific site conditions and operational needs. We will work closely with you to design the most cost-effective and high-performance solution for your utility-scale energy storage project.


Previous: 
Next: 
Inquiry

About Company

ALL THE EFFORTS OF HUACHEN PEOPLE,
ALL FOR CUSTOMER SATISFACTION.
 

Quick Links

Product Category

Contact Us

 Tongshan Economic Development Zone Industrial Park , No. 2 Qianjiang Road, Xuzhou, Jiangsu Province,China
      sales@hcbyq.com
  +86-15152458816
 Wechat : +86-15152458816
 Whatsapp:+8613624197312
      
Copyright © 2022 Jiangsu Huachen Transformer Co.,Ltd. All rights reserved. 苏ICP备07503629号-8   Support by leadong | Sitemap
We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×